![]() When draft documents are sent out for revision, they should return carrying. In the next screen, you will be asked to upload the same number of files as were selected for revision. Vocabulary Punctuation Dates Order Numbers Use a revision numbering system. Select the checkboxes for the files that are being revised and use the Revise button in the top ribbonģ. Navigate to the document module section and location that the documents being revised are locatedĢ. When slipsheeting in multiple files, it is recommended to batch the updates based on the date (each revision upload would all be tied to the same date as the date is something that is assigned to the batch that is being inserted)ġ. This method can be used to slipsheet multiple revisions into multiple documents. When users download the document file, the latest version of the file will be downloaded.Ĭlicking on the document number (left most column of grid) will open the Document Details.įrom here, all versions of the file are available for downloading and viewing. The updated information about this document will be available within the grid. The screen will refresh back to the grid where the document is saved. we have for many years directly linked our physical part revisions to the Mechanical CAD Model revisions. In the next screen, the document information can be updated, and the new file selected by using the Browse button to locate the file locally on the computer for upload Part, Document and CAD Document Revisions. Select the checkbox for the file that is being revised and use the Revise button in the top ribbonģ. Alternatively, you can click the File button from the top menu bar. Here, you’ll need to select Version History. The fastest way to do this is by clicking the file name in the top bar in Microsoft Word. Navigate to the document module section and location that the document being revised is locatedĢ. The first step is to view previous versions of Word documents. This method can be used when only a single file within a document module section needs to be revisedġ. In order to revise files, Project Members must have the permission to Edit/Modify on the applicable document module section subfolder that the document(s) reside. The Documents Report can also be used to retrieve a historical document log that shows all versions of that project document. Updates made to the documents during the revision process will be available in the grids and via The Documents Report. The system will maintain all previous versions of that document within the Edit Document Details of the document. ![]() Project Documents that reside within the Document Module sections of: Plans, Specs, General & Photo, or Closeout Documents, can have new versions of the document inserted. Modified on: Thu, 16 Feb, 2023 at 8:35 PM ![]() Obviously, cloning is of a better option, as you would still be able to reference its history on where it was cloned from (and in your original project history, to which project and at which point it was cloned).Solution home 09 - Document Management 00 - Documents Document Revisions Workspace Content Types Available to Altium Designer | Altium Designer 23 User Manual | Documentation Solution DetailsWith the subscription level of Pro or Enterprise, the revision naming scheme of individual content type for a workspace connected can be configured in Preferences, Data Management » Servers:ĭefining Revision Naming Schemes for a Workspace from Altium Designer | Altium Designer 23 User Manual | DocumentationĮxisting projects which have been released once already can not have the revision naming scheme changed, unless you delete all previous releases of the old naming scheme, or clone the project, so as to adopt a new naming scheme. I have a project in Altium 365 cloud which already have one release done, and I want to change project release number from standard scheme A.1 to something else. ![]()
0 Comments
Leave a Reply. |